Bothell Standards

Bothell Design and Construction Standards and Specifications


2020 Update

Effective January 1, 2020

Design and Construction Standards and Specifications

Appendix A:  Standard Details

Appendix B:  Surface Water Design Manual
You may use the previous version of the Surface Water Design Manual if your project meets both of these criteria:

  • Your complete project application was accepted prior to December 30, 2016; and
  • Your project will be under construction prior to January 1, 2022.

Appendix C:  General Notes

Appendix D:  Maintenance Standards (Modified Appendix A of King County Surface Water Design Manual)