Construction
-
102nd Ave NE Downtown Access Improvements
Improving pedestrian access to downtown via 102nd Ave NE by reconstructing damaged sidewalks and updating curb ramps and lighting to meet ADA requirements.
-
228th St SW/SE Pavement Preservation
This project includes rehabilitating the existing pavement on multiple segments of 228th St SW/228th St SE.
-
Annual Utility Capital Projects
The City annually funds the repair, replacement or upgrade of water, sewer and storm/surface water utilities.
-
Blyth Park Erosion Control
This project proposes to improve the storm drainage system in Blyth Park.
-
Camden Lift Station
This project retrofits the existing lift station site with new pumps, control panel, valve vault, automation hardware, and associated site improvements.
-
Downtown Contaminated Soil & Groundwater Clean Up
This project is a component of Bothell's Downtown Revitalization Plan and is identified in the Capital Facilities Plan as T47.
-
Downtown Overlay Project
This project proposes to pave several segments near Main Street in downtown Bothell.
-
Fire Station Replacements Phase I
Replacement of Fire Stations 45 and 42. Phase I Project Management Selection
-
Juanita-Woodinville Wy. NE/NE 160th St. Overlay
Paving project for Juanita-Woodinville Way NE (between NE 145th St. and I-405) and NE 160th St. (I-405 to 121st Ave. NE).
-
Main Street Extension
This project extends Main Street westward to 98th Ave NE. It ties the historic portion of Main Street to the new development west of Bothell Way NE.
-
NE 188th St Non-motorized Improvements
The NE 188th Street Non-Motorized Improvements project will enable students to walk or bike to school by improving safety, connectivity, and mobility along NE 188th Street via the Safe Routes to Schools (SRTS) program. This project proposes a contiguous pedestrian route from Bothell High School to Bothell Way via the local road, NE 188th Street.
-
North Creek Trail
North Creek Trail Section 4 is the last missing segment of the North Creek Trail within Bothell’s city limits. It will consist of a 10-foot wide shared use path along Filbert Road (SR 524).
-
Park at Bothell Landing Pedestrian Bridge Project
This project is the replacement of the existing pedestrian bridge over the Sammamish River at the Park at Bothell Landing.
-
Sammamish River Bridge Seismic Retrofit
The project consists of replacing and reinforcing portions of the bridge superstructure, substructure and piers. Construction activities will occur predominately beneath the bridge deck from either suspended work platforms or a barge.
-
SR 522 Stage 3
Stage 3 of this project provides road improvements and BAT lanes from the end of Stage 1 and 2 improvements to 83rd Place NE.
-
Water Main Replacement Project