Daytime lane closures for crack sealing

Localized single lane closures on some arterial streets for crack sealing will continue through about July 27. Each area will only be closed once for a short time. A minimum of one lane of traffic in each direction shall be maintained.

This work is weather dependent.

Date Day Location Description Time
7/20/18 Friday Brickyard Rd from NE 160th St to Woodinville Dr SB Lane closed in mobile work zone until completion followed by NB Lane closed in mobile work zone until completion  9 am - 3 pm
7/21 - 7/22/18 Saturday & Sunday No Work . .
7/23/18 Monday 228th St SW - Western City limits to 9th Ave SE Lane closures for crack sealing. Minimum of one lane of traffic in each direction shall be maintained. 9 am -3 pm
7/24/18 Tuesday Waynita Way NE- from SR 522 to NE 145th St Lane closures for crack sealing. Minimum of one lane of traffic in each direction shall be maintained. 9 am -3 pm
7/25/18 Wednesday Fitzgerald Road / 27th Ave SE - from 228 AVE SE to 240th St SE Lane closures for crack sealing. Minimum of one lane of traffic in each direction shall be maintained. 9am - 3 pm
7/26/18 Thursday East Riverside Drive - from 102th Ave NE to I-405 Lane closures for crack sealing. Minimum of one lane of traffic in each direction shall be maintained. 9am - 3 pm
7/27/18 Friday Brickyard Rd. - from NE 160th St to Woodinville Drive 10th Ave NE - from Main Street to 19th Ave SE Lane closures for crack sealing. Minimum of one lane of traffic in each direction shall be maintained. 9am - 3 pm
7/28-7/29/18   No Work    
This project involves crack sealing approximately 50 lane miles of roadway throughout Bothell. Read the full list of roads they'll be working on.