Completed
What we've been up to
The City is teeming with construction activity these days. Here are some of the recent Capital Improvement Projects we've completed.
-
4th Ave. West Sidewalk
This project constructs a raised concrete sidewalk along the west side of 4th Ave. between 219th Pl. SW and 220th St. SW. The project includes extending the curb, adding one ADA (American Disabilities Act) compliant curb ramp, and one raised concrete island.
-
7th Ave. SE/88th Ave. NE Project
7th Avenue SE/88th Avenue NE Non-Motorized Improvements Project
-
19th Ave. SE Storm System Improvements
This project will remove a damaged culvert and extend and realign the Perry Creek stream channel near 19th Ave. SE.
-
102nd Ave. NE Stormwater Retrofit Project
Provides water quality treatment to stormwater runoff from an existing portion of 102nd Ave. NE.
-
120th Ave. NE Pavement Repair
This project will replace the degraded pavement in the southbound lane of 120th Ave. NE.
-
228th Street SE & 29th Drive SE Improvements
This project creates a new traffic signal and related intersection improvements to help the flow of entering and exiting traffic at the Canyon Park Business Park.
-
228th St SW/SE Pavement Preservation
This project includes rehabilitating the existing pavement on multiple segments of 228th St SW/228th St SE.
-
228th St SE Pavement Overlay
228th St SE is an asphalt overlay project between east of 19th Ave SE and west of 35th Ave SE.
-
228th St SE Roadway Repair
This project is intended to address water on the roadway and icy road conditions during colder temperatures.
-
ADA Curb Ramps
This project provided ADA-compliant upgrades and installations of curb ramps in various locations in the City.
-
Beardslee Blvd Pavement Overlay
The Beardslee Blvd. Paving Overlay Project proposes to overlay Beardslee Blvd. between Sunrise Dr. and NE 185th Street, and partially reconstruct the pavement section from NE 185th St to 110th Ave NE with hot mix asphalt (HMA).
-
Bothell Corridor & Citywide Safety Projects
These federally funded projects provided safety improvements at various locations throughout the City.
-
Bothell-Everett Hwy & 228th St SE
This project reconfigured the intersection at Bothell-Everett Highway and 228th St SE in Canyon Park, to enhance traffic safety and operations.
-
Bothell Way NE Rockery Repair
-
Camden Lift Station
This project retrofits the existing lift station site with new pumps, control panel, valve vault, automation hardware, and associated site improvements.
-
Downtown Utility Projects
This project replaced and improved various utilities at several downtown locations.
-
Horse Creek Improvements
The project replaced the existing Horse Creek pipe with a hybrid open-channel/culvert system along 98th Ave NE.
-
Juanita-Woodinville Wy. NE/NE 160th St. Overlay
Paving project for Juanita-Woodinville Way NE (between NE 145th St. and I-405) and NE 160th St. (I-405 to 121st Ave. NE).
-
Main Street Enhancement
This project integrates the historic district with the planned overall development of public spaces in the downtown area.
-
Multiway Boulevard
Pedestrians can now cross back and forth easily between historic downtown on the east side of Bothell Way and the newly developing west side.
-
NE Woodinville Dr. Pavement Overlay Project
This project will pave about 0.75 miles of NE Woodinville Dr. between I-405 and the eastern Bothell city limits.
-
Non-Motorized Improvement near Canyon Park MS
This project will consist of three sidewalk segments along the west side of the 19th Ave SE between 228th St SE and 232nd St SE; the north side of the 232nd St SE between 19th Ave SE and 20th Ave SE; and the east side of the 23rd Ave SE between a newly constructed sidewalk and 236th St SE.
-
Park at Bothell Landing Pedestrian Bridge Project
This project is the replacement of the existing pedestrian bridge over the Sammamish River at the Park at Bothell Landing.
-
Parr Creek Temporary Measure
Construct 200 feet of storm drainage pipe as an interim drainage solution for 120th Ave. NE.
-
Penn Park Reservoir Replacement
Penn Park's potable water reservoir was replaced with a larger tank to increase its storage capacity.
-
Promontory Point Sewer Repair
This project constructs a permanent sanitary sewer replacement for affected homes in the Promontory West subdivision.
-
Sammamish River Off-Channel Habitat Restoration
This project reconnected and restored 1,100 feet of an old remnant channel and floodplain of the Sammamish River.
-
Sanitary Sewer Repair Project
The City of Bothell is starting a project to repair existing sanitary sewer lines in the Beardslee and Westhill neighborhoods.
-
Slurry Seal
The Slurry Seal project will focus on improving the pavement conditions on heavily traveled local roads around Bothell.
-
SR 522 Stage 1
This project was designed to relieve congestion on SR 522 at the 96th Ave NE intersection.
-
SR 522 Stage 2
This part of the project includes two sections of SR 522, which adjoin each end of the Stage 1 project. Stage 2A is finished, and Stage 2B is being designed.
-
Water Main Replacement Project